Some of the recent projects underway or carried out by TPL are listed below:
ESIS Project: July 2005-June 2006
Client: IT Environmental (Australia) Pty Ltd
Conduct of Preliminary Investigations (PIs) 24 sites, Groundwater Monitoring Events (GMEs) 18 sites, Environmental Site Assessments (ESAs) 3 sites, Well Abandonments 5 sites, Validation Assessment 1 site.
Design of Soil Vapor Extraction (SVE) System: June 2005-July 2005
Client: Shell Pakistan Limited
The SVE system was designed to reduce volatile organic hydrocarbons (VOCs) in the soil strata to below screening levels determined for the site lithology. A ninety-day campaign period was used as basis and design parameters selected so that locally available materials can be used.
Phase Separated Hydrocarbon (PSH) recovery: July 2005-December 2006
Client: Shell Pakistan Limited
Shell Pakistan Limited contracted with TPL for the recovery of PSH via manual baling over an 18 month period. Current work scope is being managed by TPL at five sites.
Wastewater Treatment Facility: July 2005-December 2005
Client: Qasim International Container Terminal (QICT)
QICT contracted with TPL to carry out needs assessment of its requirements and develop specifications and tender documents for a wastewater treatment facility to meet the National Environmental Quality Standards (NEQS). TPL will also supervise the project implementation.
Network Environmental Risk Assessment Data Review and Upload:July 2005-December 2005
Clients: Shell Hong Kong Limited; Brunei Shell Marketing Co., Societe Shell Du Laos; Shell Pakistan Ltd; Shell Oman Marketing Co SAOG, Shell Company of Australia Ltd
The various regional Shell companies contracted with TPL to review their past and current network environment risk assessment survey data on retail sites and upload them after due modifications into the web based data base of their proprietary assessment software.
Web Based Surveillance Camera Supply and Installation: July 2005 - August 2005
Client: Aga Khan University Hospital (AKUH)
AKUH contracted with TPL for the supply and installation of a surveillance camera to monitor access to the Presidents Office from multiple local and remote locations. TPL sourced, procured and installed the device to meet the requirement.
Operation and Monitoring of Soil Vapor Extraction (SVE) System: February 2006 – October 2006
Client: Shell Pakistan Limited
The SVE system designed and partly installed by TPL was commissioned and put into operation by TPL who are also charged with the day-to-day operation, monitoring and testing of the system.
Network Environmental Risk Assessment II: Field Survey and Data Entry for 1100 retail sites March 2006-August 2006
Clients: IT Environmental (Australia) Pty Ltd for Shell Pakistan Ltd sites
TPL conducted a survey of around 1100 petrol pumps, commercial sites and surroundings located all over Pakistan collecting extensive site and surrounding data required for the NERA II questionnaire in only a two month time frame. Field collected, Shell provided and available historical records were compared to QC and select best data. Additional details such as water quality measurements for above and below ground water resources using portable TDS meters; photographic records of sites, etc., were also collected. Deliverables included a spreadsheet with all collected data formatted as per Shell NERA II software.
Provision of Health, Safety and Environment Monitoring and Training:April 2006 – March 2007
Client: Johnson & Johnson Pakistan Limited
Johnson & Johnson Pakistan (Pvt) Limited have asked TPL to assist them in the development of their HSE standard operating procedures, document them, carry out training of the staff and monitor the process in line with their ISO 14000 and other certifications requirements. The industrial hygiene and safety procedures were given preference.
ESIS Project Extension: July 2006- December 2006
Client: Coffey Environments Pty Ltd Australia
Conduct of Groundwater Monitoring Events (GMEs) 11 depot sites and 1 retail site, Environmental Site Assessment (ESA) 1 depot sites.

Installation of Monitoring Wells: November 2006-December 2006
Client: Chevron Pakistan Limited
Conduct of a Phase 1 and Phase 2 site assessment at six of the Chevron operational depots in Pakistan, including soil boring and installation of monitoring wells.
Baseline Survey for Chemicals Impact: November 2006-March 2007
Client: Shell Pakistan Limited
Conduct of survey and sample collection as per advised protocol for soil and groundwater at three sites that warehoused crop protection chemicals in the past.
Monitoring of Operator and Vehicle Fitness: December 2006
Client: Qasim International Container Terminal (QICT)
Conduct of a continuous 48 hour survey to monitor fitness of Trailers on the terminal in accordance with checklist and of the bona fides of the vehicle operators as per given specifications.
Tank Testing at Consumer Facilities: December 2006 – June 2007
Client: Shell Pakistan Limited
Conduct of Tank Integrity Testing at 90 underground fuel tanks (gasoline, kerosene, diesel) at 60 Consumer facilities all over Pakistan using EPA approved and certified magnetostrictive probes for wet portion and acoustic method for ullage part.
Installation of Monitoring Wells: March 2007- June 2007
Client: Chevron Pakistan Limited
Conduct of a Phase 1 and Phase 2 site assessment at six more of the Chevron operational depots in Pakistan, including soil boring and installation of monitoring well.
Tank Integrity Testing of Semi Buried Tanks at Chaklala Depot. May 2007
Client: Shell Pakistan Limited
Special procedure based on USEPA guidelines for Tank Tightness Testing of large (>120,000 L) underground storage tanks utilizing magnetostrictive probes
Tank Integrity Testing of Semi Buried Tanks at Chaklala Depot. May 2007
Client: Shell Pakistan Limited
Special procedure based on USEPA guidelines for Tank Tightness Testing of large (>120,000 L) underground storage tanks utilizing magnetostrictive probes
Environmental Site Investigations at 2 former Shell Chemicals formulation Plants at Keamari, Karachi: June 2007
Client: Shell Pakistan Ltd. / Coffey Environments
Conduct of a Phase 1 and Phase 2 site assessments under supervision of Coffey Environments experts in chemical site assessments and remediation.
Installation of Monitoring Wells: July 2007
Client: Chevron Pakistan Limited
Installation of five 6” wells at Keamari Terminal for PSH delineation monitoring and remediation.
Environmental Site Investigation: August 2007
Client: Chevron Pakistan Limited
Conduct of Environmental Site Assessment for a tank pull operation at Karachi Aviation Site.
Crude Oil and Condensate Loss – Audit : August 2007
Client: British Petroleum Pakistan Exploration & Production Inc
Survey and assessment of 14 crude oil processing facilities to identify and evaluate crude oil and condensate losses.
HAZOP Study for Zamzama Condensate Facilities at Bubak: August 2007
Client: PARCO
Hazard and operability study for condensate pipeline tie-in facility
Hazard Studies and Hazard Analysis August 2007 – December 2007
Client: (Pakistan PTA Ltd)
Provision of services for reviewing stage 1, 2, 3 HAZOP studies, modifications, revisions, and where applicable stage 5 and stage 6 HAZOP
EIA Study Green Power (Pvt) Ltd. : October 2007
Client: United Registrar of Systems (URS)

Conduct of Environmental Impact Assessment of 47.5MW Wind Energy project to IFC specifications.
Shell Environmental Site Investigation Services: November 2007
Client: Shell Pakistan Limited
Conduct of Groundwater Monitoring Events (GMEs) at 10 depots. Environmental Site Assessment (ESA) for 2 Lubricant Sites, Preliminary Investigation Plus for 6 retail sites, and Preliminary Investigation for 1 Lubricant Site.
EIA Study at Beacon Energy Ltd.: November 2007
Client: United Registrar of Systems (URS)
Conduct of Environmental Impact Assessment of 47.5MW Wind Energy project to IFC specifications.
Site Archival and Data Aggregation System – November 2007
Client: Shell Pakistan Limited
Developed a navigable site index allowing easy access to aggregated Information Assets and content across SPL facilities. Information Assets included 1900+ documents, spreadsheets, drawings and reports.
Shell Environmental Site Investigation Services – January 2008
Client: Shell Pakistan Limited
Conduct of Environmental Site Assessment (ESA) for 7 Consumer Facility Sites, Preliminary Investigation Plus for 8 retail sites.
HAZOP Study for Korangi - Port Qasim link pipeline & tanker discharge line (TDL) Interconnection facilities at Keamari.: February 2008
Client: PAPCO
Hazard and operability study for the facility
Environmental Site Investigations (Groundwater Monitoring Event): April 2008
Client: Chevron Pakistan Limited
Conduct of Groundwater Monitoring Event (GME) for 6 Depots
Environmental Site Investigation Services (Shell CKL-ISB Pipeline Modification): May 2008
Client: Shell Pakistan Limited
Preliminary Investigation of Chaklala - Islamabad Pipeline Modification Project.
Phase Separated Hydrocarbon (PSH) Characterization Study : July 2008
Client: Chevron Pakistan Limited
PSH recovery studies at Chevron Keamari Terminal Karachi
ESHIA for PRL Refinery Upgrade Project : July 2008
Client: Environmental Recource Management (ERM) Malaysia
Environment, Social, and Health Impact Assessment (ESHIA) study for Pakistan Refinery Limited (PRL) Upgrade project.
Soil and Groundwater Testing : September 2008
Client: Pakistan State Oil
Site assessment including installation of monitoring wells at Keamari (Kerosene +Gasoline) Terminals and JIMCO facility at Mehmood Kot.
Validation Soil Sampling : December 2008
Client: Chevron Pakistan Limited
Validation soil sampling (VSS) at the time of underground tanks removal at Chevron Multan Bulk Oil Terminal and report generation.
Environmental Monitoring - Korangi Pipeline Leak : December 2008
Client: Pak - Arab Refinery Limited (PARCO)
Delineation of the areas of impact, monitoring VOCs in air, water quality of waters in use, impact on surface soil, particulates in air for determination of risk to the residents.
Global Environmental Site Investigation Services (GESS): September 2008 - Ongoing
Client: Environmental Resources Management (ERM) Malaysia for Shell Pakistan Ltd.)
Carried out conduct of Environmental Site Assessment (ESA) for 9 Consumer Facility Sites and 39 Retail outlets and 3 Aviation sites till date, and completed Preliminary Investigations (PI) at 26 Retail sites and 1 Lubricating Oil plant. 2 retail sites also involved Tank Pull monitoring and disposal of more than 25 tons of impacted soil. TPL also carried out Soil Remediaton ,Validation and Disposal works at Heavy Mechanical Complex and dispose 192 tons of impacted soil.
Mirpur Khas / Khipro (MKK) Crude / Gas / Condensate Agreements Alignment with BP Badin Master Agreement : March 2009
Client: British Petroleum Pakistan Exploration & Production Inc
Evaluating existing MKK contracts and aligning them with the Badin Agreement including provision for LPG facilities.
Tank Testing at Consumer Facilities: April 2009
Client: Shell Pakistan Limited
Conduct of Tank Integrity Testing at 18 underground fuel tanks (gasoline, kerosene, and diesel) at 16 Consumer facilities all over Pakistan using EPA approved and certified magnetostrictive probes for wet portion and acoustic method for ullage part.
Physical Verification of Fixed Assets: April 2009
Client: Shell Pakistan Limited
Field verification and tagging of fixed assets at Installations, Depots, Airfields, Offices, Guest houses etc. throughout the country.
EIA Study Tenaga Generasi Limited: June 2009
Client: Tenaga Generasi Limited (Part of Dawood Group)
Conduct of Environmental Impact Assessment of 47.5MW Wind Energy project to IFC specifications located in the Gharo Wind Corridor.
Baseline Ambient Air Monitoring PRL Upgrade Project: January 2010
Client: Pakistan Refinery Limited. (PRL)
Conduct of the Ambient Air Monitoring to undertake ambient air quality monitoring for the period of one month the project to define the baseline air quality in the surrounding area of PRL.
Pepsi Co. Post Audit Photographic Evidence Visit: January 2010
Client: Environmental Resources Management (ERM) Abu Dhabi.
Conduct of photographic evidence gathering of significant environmental aspects, (related to both local regulatory compliance and contamination potential) of Pepsi Co. potato chips manufacturing plant on behalf of ERM.
IEE of Agroventures (Pvt.) Limited (APL): February 2010
Client: United Registrar of Systems (URS)
Conduct of Initial Environmental Examination (IEE) for corn flakes manufacturing plant of Agroventures (Pvt.) Limited (APL).
|